Doone Silver Kerr

Lycée Albert Camus, France

Status Constructed 1991-1993
Size 14,500m2
Practice Foster & Partners

This flagship school accommodates up to 900 students, offering a range of academic and vocational courses. The school’s linear plan form, natural systems of ventilation and solar shading provide a low-energy and cost-effective solution to the demands of the Mediterranean site and climate.

John was Project Director (competition and scheme design stage) at Foster + Partners

Back to John Silver